Electrical Services in Van Nuys

Subpanel Installation in Van Nuys & the Valley

Out of breaker space, or adding a garage shop, ADU or room addition? A subpanel feeds the new space from your main panel. Our licensed electricians check the load, install the subpanel and handle the permit.

Google reviews for PowerRoute Electric & Plumbing
Yelp reviews for PowerRoute Electric & Plumbing
Get Your Fast, Free Quote

No obligations. Honest pricing from licensed electricians.

Albert Castillo of PowerRoute Electric & Plumbing with the company trucks
2-YearLabor Warranty on Every Job
PowerRoute Electric & Plumbing

Subpanels Installed by a Van Nuys Crew

One team from load check to final inspection

A subpanel takes power from your main panel through a feeder and splits the power into new circuits in another part of the property. Garages, ADUs, room additions and workshops are the usual reasons. We check the load first, so the subpanel never draws more than your service supplies.

We install garage subpanels, ADU and addition subpanels and commercial subpanels, and we replace old subpanels. For work on the main panel itself, see our electrical panel service and replacement page.

  • Load Check Before We Quote
  • Garage, ADU and Addition Subpanels
  • Old Subpanel Replacement
  • Permit and Inspection Handled
When to Call Us

Signs You Need a Subpanel

A subpanel fits when your main panel has the power but not the room, or when the new space sits far from the main panel. These are the calls we get most.

multi-meter bank

No Open Breaker Slots

Your main panel is full and the breakers are already doubled up. A subpanel adds slots without a new main panel.

Building an ADU or Addition

New living space needs its own circuits, and a subpanel near the space keeps the runs short.

Garage Shop or EV Charger

Welders, compressors and EV chargers need dedicated circuits out in the garage.

Old or Damaged Subpanel

Rust, heat marks, loose breakers or an obsolete brand mean replacement time.

Not Sure You Have the Capacity? Check Your Main Breaker

Look at the large breaker at the top of your main panel. The number on the handle is your service size. On 100-amp service, a load check comes before any subpanel. Send us a photo and we will tell you where you stand.

Subpanel or Upgrade

A Subpanel Adds Space, Not Power

A subpanel shares the power your service already has. If the load check shows your service is maxed out, you need a panel upgrade first, or both on the same permit.

Check the Load First

We add up what your home draws today plus the new loads, then size the subpanel and feeder to match.

Install the Subpanel

New subpanel, feeder, grounding and breakers, mounted where the new circuits need them.

Upgrade the Main Service

If the numbers fall short, we quote the service upgrade next to the subpanel so you see both.

New or Replacement

Add a New Subpanel or Replace the Old One?

Some jobs add a subpanel where none existed. Others swap an old one with failing breakers or a brand inspectors flag. On a Federal Pacific or Zinsco subpanel, we replace the subpanel and check the main panel on the same visit.

New electrical panel being prepared for installation

Add a New Subpanel

Usually the right call when
  • Your main panel is full but your service has spare capacity
  • You are building an ADU, addition or garage shop
  • The new space sits far from the main panel
  • You want new circuits without a full service upgrade

Replace the Old Subpanel

Usually the right call when
  • The subpanel shows rust, heat marks or loose breakers
  • Replacement breakers for the brand are hard to find
  • Breakers trip or run hot under normal load
  • A remodel needs more spaces in the same spot

Out of Breaker Space? Get a Subpanel Quote Today

Every subpanel job is backed by our 2-year labor warranty. Call our Van Nuys shop and a licensed electrician will set up a time to look at your panel.

How It Works

From First Call to Final Inspection

  1. 01

    Call or Request a Quote

    Tell us what the new space needs to run. We ask a few questions and set a time to look at your main panel.

  2. 02

    We Check the Load

    We look at your service size, main panel and the route to the new space before we price anything.

  3. 03

    Written Price Before Work

    You get the subpanel, feeder and any service work in writing, so you choose with the price in front of you.

  4. 04

    Install, Permit and Inspection

    We do the work and handle the permit. In the City of Los Angeles we pull the LADBS electrical permit. In Burbank, Glendale and other cities we go through the local building department. Then we meet the inspector.

Customer calling PowerRoute Electric & Plumbing
PowerRoute Electric & Plumbing service truck on a job
Albert Castillo of PowerRoute working from a lift
Real Reviews

Don't Take It From Us! Hear It From Our Happy Customers

★★★★★
“Very professional and easy to work with. Albert is always going above and beyond for his clients. Anything you need, he will always be there to help!”
CCristian AmbrosioGoogle review
★★★★★
“They went above and beyond by giving us a breakdown of what the cheaper option vs the best solution would look like in terms of cost and long term solution. Power Route was very transparent and delivered high quality work.”
EEdwin ReynaGoogle review
★★★★★
“From the first call to the final installation, their team was professional, punctual, and extremely knowledgeable. They took the time to explain the process, answered all my questions, and completed the work efficiently and neatly.”
MMario MarinGoogle review
Service Coverage

Subpanel Installation Across the San Fernando Valley

Our shop is at 16735 Saticoy St in Van Nuys, so most Valley homes are a short drive away. We also serve Burbank, Glendale, Pacoima and the foothill cities.

FAQs

Subpanel Questions From Valley Homeowners

How much does subpanel installation cost in Los Angeles?

Our panel upgrade cost guide uses a planning range of $1,200 to $3,500 for adding a subpanel. Distance to the new space, feeder size and trenching move the price, and ADU or detached garage jobs with long runs land higher. You get a written price after we look at your panel.

Do I need a permit to add a subpanel in Los Angeles?

Yes. LADBS requires an electrical permit to add or replace a subpanel. We pull the permit, do the work to code and meet the inspector. Unpermitted panels cause trouble at resale and with insurance.

Will a subpanel give my home more power?

No. A subpanel shares the power your main service already has. The subpanel adds breaker slots and puts circuits closer to where you need them. If your service is maxed out, the fix is a panel upgrade.

What size subpanel does an ADU need?

The answer depends on the ADU heating, cooking, water heater and AC. Many ADUs run on a 60 to 100 amp subpanel fed from the main panel, and some need a separate meter instead. We run a load calculation before we quote.

Do you install subpanels in garages?

Yes. We install garage subpanels for workshops, EV chargers, freezers and laundry. A detached garage needs a feeder run, usually trenched, plus its own grounding electrode.

When should an old subpanel be replaced?

Replace a subpanel with rust, heat damage, loose or scorched breakers, or a brand with known breaker problems, such as Zinsco or Federal Pacific. We also replace subpanels when a remodel needs more spaces.

Do you install commercial subpanels?

Yes. We install and replace commercial subpanels, and we handle tenant improvements and equipment circuits through our commercial electrical service.

Contact Us

Get Your Free Subpanel Estimate Today

Tell us what the new space needs to run, and a licensed PowerRoute electrician will call you back.

Call Now(323) 616-2829