Out of breaker space, or adding a garage shop, ADU or room addition? A subpanel feeds the new space from your main panel. Our licensed electricians check the load, install the subpanel and handle the permit.
No obligations. Honest pricing from licensed electricians.
A subpanel takes power from your main panel through a feeder and splits the power into new circuits in another part of the property. Garages, ADUs, room additions and workshops are the usual reasons. We check the load first, so the subpanel never draws more than your service supplies.
We install garage subpanels, ADU and addition subpanels and commercial subpanels, and we replace old subpanels. For work on the main panel itself, see our electrical panel service and replacement page.
A subpanel fits when your main panel has the power but not the room, or when the new space sits far from the main panel. These are the calls we get most.
Your main panel is full and the breakers are already doubled up. A subpanel adds slots without a new main panel.
New living space needs its own circuits, and a subpanel near the space keeps the runs short.
Welders, compressors and EV chargers need dedicated circuits out in the garage.
Rust, heat marks, loose breakers or an obsolete brand mean replacement time.
Look at the large breaker at the top of your main panel. The number on the handle is your service size. On 100-amp service, a load check comes before any subpanel. Send us a photo and we will tell you where you stand.
A subpanel shares the power your service already has. If the load check shows your service is maxed out, you need a panel upgrade first, or both on the same permit.
We add up what your home draws today plus the new loads, then size the subpanel and feeder to match.
New subpanel, feeder, grounding and breakers, mounted where the new circuits need them.
If the numbers fall short, we quote the service upgrade next to the subpanel so you see both.
Some jobs add a subpanel where none existed. Others swap an old one with failing breakers or a brand inspectors flag. On a Federal Pacific or Zinsco subpanel, we replace the subpanel and check the main panel on the same visit.
Every subpanel job is backed by our 2-year labor warranty. Call our Van Nuys shop and a licensed electrician will set up a time to look at your panel.
Tell us what the new space needs to run. We ask a few questions and set a time to look at your main panel.
We look at your service size, main panel and the route to the new space before we price anything.
You get the subpanel, feeder and any service work in writing, so you choose with the price in front of you.
We do the work and handle the permit. In the City of Los Angeles we pull the LADBS electrical permit. In Burbank, Glendale and other cities we go through the local building department. Then we meet the inspector.
“Very professional and easy to work with. Albert is always going above and beyond for his clients. Anything you need, he will always be there to help!”
“They went above and beyond by giving us a breakdown of what the cheaper option vs the best solution would look like in terms of cost and long term solution. Power Route was very transparent and delivered high quality work.”
“From the first call to the final installation, their team was professional, punctual, and extremely knowledgeable. They took the time to explain the process, answered all my questions, and completed the work efficiently and neatly.”
Our shop is at 16735 Saticoy St in Van Nuys, so most Valley homes are a short drive away. We also serve Burbank, Glendale, Pacoima and the foothill cities.
Our panel upgrade cost guide uses a planning range of $1,200 to $3,500 for adding a subpanel. Distance to the new space, feeder size and trenching move the price, and ADU or detached garage jobs with long runs land higher. You get a written price after we look at your panel.
Yes. LADBS requires an electrical permit to add or replace a subpanel. We pull the permit, do the work to code and meet the inspector. Unpermitted panels cause trouble at resale and with insurance.
No. A subpanel shares the power your main service already has. The subpanel adds breaker slots and puts circuits closer to where you need them. If your service is maxed out, the fix is a panel upgrade.
The answer depends on the ADU heating, cooking, water heater and AC. Many ADUs run on a 60 to 100 amp subpanel fed from the main panel, and some need a separate meter instead. We run a load calculation before we quote.
Yes. We install garage subpanels for workshops, EV chargers, freezers and laundry. A detached garage needs a feeder run, usually trenched, plus its own grounding electrode.
Replace a subpanel with rust, heat damage, loose or scorched breakers, or a brand with known breaker problems, such as Zinsco or Federal Pacific. We also replace subpanels when a remodel needs more spaces.
Yes. We install and replace commercial subpanels, and we handle tenant improvements and equipment circuits through our commercial electrical service.
Tell us what the new space needs to run, and a licensed PowerRoute electrician will call you back.